Text
A contractor's guide to the FIDIC conditions of contract
This guide will help the contractor’s staff overcome some of the difficulties encountered on a typical international contract using FIDIC forms.
The majority of FIDIC-based contracts use the Red Book (Conditions of Contract for Construction), so this book concentrates on the use of those particular forms. Supplementary comments are included in Appendix C for the Yellow Book (Plant & Design-Build) recommended for use where the contractor has a design responsibility.
The Contractor is represented on site by the Contractor’s Representative who carries the overall responsibility for all the Contractor’s on-site activities.
B20111444 | 343.07869 ROB c | My Library | Tersedia |
Tidak tersedia versi lain